If your solicitor has mentioned "indemnity insurance" partway through your new build purchase, it usually means they have found a legal loose end that nobody wants to spend weeks sorting out before completion. On a new build, that loose end is rarely about the house itself — it is almost always about the paperwork trail behind it: a missing sign-off, an unregistered consent, or an old restriction on the title that technically still applies to a plot that has been a field for the past eighteen months.

Indemnity insurance (sometimes called a legal indemnity policy, a title indemnity policy, or an insurance-backed guarantee, though that last term more properly describes new homes warranties) is a one-off insurance policy that protects you financially if a specific, defined legal defect is ever enforced against you. It does not fix the defect. It does not make the defect go away. It simply transfers the financial risk of that defect being acted upon — by a council, a neighbour, or another third party — from you to an insurer, in exchange for a single premium paid once, with no ongoing cover to renew.

On resale properties, indemnity insurance has been standard practice for decades, typically covering things like a missing planning permission from 1987 or an extension built without building regulations approval. On new builds, buyers are often surprised to encounter the same conversation, because the property is brand new and feels like it should come with a clean slate. In practice, new developments generate exactly the kind of gaps indemnity insurance was designed for — multi-plot sites completed in phases, roads not yet adopted, and certificates that lag months behind physical completion.

Indemnity insurance insures against a risk being enforced, not against the defect itself existing. It is a financial backstop, not a repair, and it will not pay for remedial building work unless a third party first forces the issue.

This guide explains what a typical new build indemnity policy actually covers, what it deliberately excludes, when accepting one is a sensible, proportionate way to keep your purchase moving, and when it should make you pause and ask harder questions before you exchange contracts.

What a New Build Indemnity Policy Actually Covers

A legal indemnity policy is written to respond to one named, specific risk, identified by your conveyancing solicitor during their searches and title investigation. On a new build, the risks that most commonly get this treatment fall into a handful of recurring categories.

  • Missing or delayed building regulations completion certificate. The physical building work may be fully signed off by NHBC, LABC or an approved inspector, but the final certificate has not yet been issued or registered with the local authority at the point you need to complete.
  • Absent or unclear planning permission/discharge of conditions. The outline or reserved matters consent for the development is on file, but evidence that every pre-commencement or pre-occupation condition has been formally discharged has not yet reached the local land charges register.
  • Restrictive covenants from the historic title. The land the development sits on may carry old covenants — for example, a prohibition on building more than one dwelling, or a requirement to use land only for agriculture — dating from before the site was sold for housing, which technically remain on the title even though the development has planning consent.
  • Unregistered or unadopted rights of way and easements. A right of way benefiting a neighbouring plot, or an easement for drainage, that exists on paper but has not been formally varied to reflect the new layout.
  • Chancel repair liability. A historic, little-used liability under which owners of land once linked to a parish church could be asked to contribute to chancel repairs — now rare but still occasionally flagged on searches.

In each case, the policy pays out financial compensation if the risk materialises: for example, if the local authority later required remedial building work and your indemnity insurer accepted the claim, the policy would typically cover the cost of that work, associated professional fees, and any resulting drop in property value, up to the sum insured.

Risk identifiedWhat the policy typically pays for if it crystallises
Missing building regulations certificateCost of remedial work ordered by the council, legal costs, diminution in value
Undischarged planning conditionCost of compliance or enforcement action, legal costs
Restrictive covenant breachCompensation to the party enforcing it, an injunction defence, legal costs
Chancel repair liabilityContribution demanded by the parochial church council, legal costs

It is worth reading the specific policy wording your solicitor obtains, because the sum insured is usually matched to your purchase price (or your mortgage lender's valuation) and the definition of the insured risk is drawn narrowly. A policy covering "absence of building regulations completion certificate for the construction completed in 2024" will not help if a completely different defect surfaces in 2028.

What Indemnity Insurance Does Not Cover

This is the part buyers most often misunderstand, and it matters because an indemnity policy can create a false sense that "everything is now sorted." It is not. The policy is deliberately narrow, and several things sit firmly outside its scope.

  • It does not fix the underlying defect. If building regulations sign-off is genuinely missing because an inspector never signed off a stage of construction, the house still lacks that certificate after you complete. The policy only pays out if someone later tries to enforce the consequences.
  • It does not cover known, ongoing physical defects. Indemnity insurance is for legal and title risks, not for snagging items, damp, cracked plaster, or anything a pre-completion survey would pick up. Structural or workmanship issues are a matter for your new homes warranty and the developer's contractual obligations, not an indemnity policy.
  • It does not cover you if you disclose the risk to a third party before completion. Most policies are void, or the insurer can decline a claim, if you or your solicitor tell the local authority, a neighbour, or anyone with an interest about the defect after the policy is taken out. This is why indemnity policies are typically arranged silently, with no notice given to the party who might enforce the risk.
  • It does not cover future changes you make. If you later build an extension or convert the loft, and that work interacts with the same defect, the original policy will not extend to cover your own new works.
  • It will not necessarily satisfy a future buyer's solicitor or their mortgage lender. Most policies are designed to transfer with the property on a future sale, but some lenders or cautious solicitors still ask questions, and a policy with a low sum insured relative to a much higher future value can look inadequate years down the line.
An indemnity policy manages financial exposure to a defined risk. It is not a certificate of good health for the property, and it should never be treated as proof that a problem has been resolved.

Because the policy depends on nobody raising the issue, your solicitor will usually advise you not to approach the local authority, the original developer's building control body, or anyone else about the specific defect once a policy is in place — doing so yourself could invalidate the very protection you have just paid for.

Why This Comes Up So Often on New Builds Specifically

Buyers of period or older resale homes often assume indemnity insurance is a "second-hand house problem." In fact, new build transactions generate their own distinct set of triggers, mostly tied to the mechanics of how large developments are built, phased, and signed off.

Phased completion certificates

Developers typically build in phases across a site, and building control inspectors sign off plots in batches as each phase reaches completion. If you are buying one of the earlier plots to complete in a phase, the final completion certificate for your specific plot can genuinely still be working its way through the local authority or approved inspector's system at the point your solicitor needs to report to you ahead of exchange.

Roads, sewers and estate infrastructure not yet adopted

Related but distinct topics — estate road and sewer adoption and the Section 38 and Section 104 agreements that govern it — sometimes overlap with indemnity conversations, because an unadopted road can also mean the planning conditions relating to its construction have not yet been formally discharged.

Historic agricultural or greenfield titles

Many new developments are built on land that was previously farmland, woodland, or a single large estate. The title to that land often carries covenants written decades or even a century ago, intended for an entirely different use. A developer's legal team should have dealt with the major ones, but minor historic covenants sometimes surface only when your solicitor examines the registered title for your specific plot. See our guide to understanding new build restrictive covenants for more on how these typically arise.

Staggered discharge of planning conditions

Large sites are often granted outline planning permission, followed by multiple reserved matters applications, each carrying its own set of conditions — acoustic reports, ecology surveys, highways sign-off, and so on. Local authorities can be slow to formally confirm discharge of every condition in writing, even when the physical requirement has been met on site, leaving a documentary gap that shows up on your local search.

As of 2026, local authority planning and building control departments remain under resourcing pressure in many areas, and documentary delays of this kind are common on larger sites — buyers should expect the possibility, not treat it as unusual.

None of this means something has gone wrong with your specific home. It usually means the administrative trail has not caught up with the physical build, and a solicitor who flags it early is doing their job properly rather than causing unnecessary alarm.

Reasonable Solution or Red Flag? A Decision Framework

The honest answer is that indemnity insurance is sometimes the sensible, proportionate way to keep a straightforward transaction moving, and sometimes a way of papering over a problem that deserves a harder look. The difference usually comes down to a few practical questions you and your solicitor should work through together before you accept a policy in place of resolving the underlying issue.

QuestionLeans toward "reasonable"Leans toward "red flag"
How old is the defect?Administrative lag of weeks or a few months, work physically completeDefect has existed unresolved for years with no explanation
Is the physical work actually done to standard?Yes — confirmed by NHBC/LABC inspection records, just the certificate is delayedUnclear or no evidence the underlying work was ever inspected
Does the developer acknowledge the issue?Developer's solicitor is open about it and offers to pay for the policyDeveloper is evasive or the issue only surfaced after you pushed for detail
Is it a one-off plot issue or site-wide?Isolated to timing on your specific plotAffects the whole development, suggesting a systemic compliance gap
What does your lender's solicitor say?Lender's panel solicitor accepts the policy as standard practiceLender raises additional requirements or declines to proceed on the policy alone

A useful rule of thumb: indemnity insurance is a reasonable tool for administrative and documentary gaps where the underlying substance (the building work, the land use) is sound and simply hasn't caught up on paper. It is a weaker fit for substantive gaps — where you cannot be confident the work was actually inspected, or where a covenant genuinely restricts what can be built, and the policy is being used to avoid asking the developer to sort it out properly.

Ask your solicitor directly: "If I didn't take this policy, what would it take to resolve the underlying issue, and how long would that take?" The answer tells you whether the policy is covering a minor timing gap or quietly accepting a problem that should have been fixed.

It is also worth asking whether the developer's solicitor proposed the policy unprompted, or whether your own solicitor had to chase for an explanation after spotting something in the title or searches. The former is routine housekeeping on a large site; the latter deserves a more careful conversation before you commit to exchange.

Who Pays for the Policy in a New Build Transaction?

There is no single legal rule dictating who pays, and this is one of the more negotiable points in a new build purchase — though in practice, market convention leans heavily in the buyer's favour on this specific cost.

  • Developer pays, most commonly. Because the defect usually arises from the developer's own build programme, land acquisition history, or planning process, most reputable developers will arrange and pay for the indemnity policy themselves, instructing their solicitor to put it in place before legal completion. This is standard practice across most volume housebuilders.
  • Buyer pays, occasionally. On some transactions — particularly where the defect is historic and predates the developer's ownership, such as a very old restrictive covenant, or where you are buying an early resale of a new build from a previous owner rather than directly from the developer — the cost may fall to you. Premiums for standard new build risks are usually modest, but it is still worth confirming before you budget for completion.
  • Negotiated as part of completion. Occasionally the point is used as a minor negotiating lever: a buyer might ask the developer to cover the premium as a condition of proceeding without delay, particularly if the issue was only disclosed late in the process.
Ask explicitly, in writing, who is arranging and paying for any indemnity policy before you agree to proceed on that basis — do not assume it is included until your solicitor confirms it.
Typical premium (one-off, as of 2026 — always check current quotes)Who usually pays
£50–£150 — minor documentary gap, modest sum insuredDeveloper, as standard practice
£150–£400 — restrictive covenant or planning condition risk, higher sum insuredDeveloper or shared, case by case
£400+ — higher-value property, complex or unusual riskNegotiated; occasionally split or buyer-funded

These figures are indicative only — actual premiums depend on the insurer, the sum insured (usually tied to your purchase price), and the specific risk being covered, and you should always get the exact figure confirmed by your solicitor rather than budgeting from a guide. Many policies for straightforward new build administrative gaps are, in practice, cheap relative to the legal fees that resolving the underlying issue properly might otherwise cost, which is part of why they are so widely used.

Deep Dive: Missing Building Regulations Sign-Off

This is the single most common reason indemnity insurance appears on a new build file, so it is worth understanding in detail. Building regulations approval is separate from planning permission: it confirms the construction itself — structure, fire safety, insulation, drainage, electrics — meets the technical standards in force at the time of building, and is signed off either by the local authority's building control team or by an approved/registered inspector such as NHBC Building Control or a private approved inspector.

Why the certificate can be missing at completion

  • The inspector has approved the work on site but has not yet issued the formal completion certificate — a purely administrative lag.
  • The developer is completing a block or phase in stages, and the final certificate covers the whole phase rather than individual plots, so it is issued after your specific plot's physical completion.
  • In rarer cases, a stage inspection was missed or a minor technical query is still being resolved with the inspector before they will sign off.

What your solicitor should check before recommending a policy

A careful solicitor will not simply accept "it's fine, take the insurance" from the developer's side. They should ask to see evidence that the relevant inspections actually took place — for example, a letter or notice from NHBC or the approved inspector confirming the build was inspected and found satisfactory, even if the final certificate is still pending administratively. This distinction matters enormously: a policy covering a certificate that is simply delayed in the post is a very different proposition from a policy covering a certificate that might never be issued because an inspection was skipped.

Ask your solicitor to request the inspector's final inspection notice or completion confirmation, not just assurance that "a policy is being arranged." The notice is evidence the work passed; the policy is just financial cover if that later turns out to be wrong.

If the certificate is missing because of a genuine compliance problem rather than paperwork timing, an indemnity policy still technically "solves" the legal risk for conveyancing purposes, but you would be buying a property with an unresolved physical compliance question that a future buyer's solicitor, and potentially your own new homes warranty provider, may want answers on eventually. This is the scenario where pausing to get written confirmation from the developer, rather than accepting the policy at face value, is worth the short delay.

Deep Dive: Absent Planning Consents and Restrictive Covenants

The second most common trigger is a gap around planning permission or an old restriction on the title, and the right response differs depending on which one you are dealing with.

Undischarged planning conditions

Most planning permissions for new developments carry dozens of conditions — drainage strategy, ecology mitigation, construction management, highways works, affordable housing provision, and more. Some are "pre-commencement," meaning technically nothing should have started on site until they were discharged; others are "pre-occupation," meaning they should be resolved before anyone moves in. Local authorities can take months to formally confirm discharge in writing even after the developer has satisfied the requirement on the ground, which is where the documentary gap, and the indemnity policy, tends to appear.

The risk being insured here is that the local authority could, in theory, take enforcement action for a breach of planning control. In practice, where the substantive requirement has clearly been met on site, enforcement against an individual homeowner over a technical discharge delay is unusual — but "unusual" is not "impossible," which is exactly why the insurance exists.

Restrictive covenants

A restrictive covenant is a promise attached to land, binding future owners, restricting how it can be used — common historic examples include bans on running a business from the property, restrictions on building more than one house per plot, or requirements to maintain a boundary or hedge. On a converted agricultural site, old covenants can predate the development entirely and technically still bind each new plot, even though the use they were written to prevent (housing) is now exactly what has been built.

Indemnity insurance for a restrictive covenant covers the risk that whoever holds the benefit of the covenant — often a neighbouring landowner, sometimes impossible to even identify after decades — takes legal action to enforce it, typically seeking an injunction or compensation. Where the party with the benefit cannot realistically be identified or located, or where enforcement would be wildly disproportionate to the covenant's original purpose, insurers are generally comfortable providing cover. Where the covenant is recent, the beneficiary is a known, active neighbour, or the restricted use is clearly and currently being breached in an obvious way, a policy is a much weaker answer. For more detail on how these arise and are drafted, see our guide to understanding new build restrictive covenants.

The key question for any covenant-related policy: can you and your solicitor identify who could enforce it, and if so, is it credible they would ever bother? If the answer to the first part is "no, nobody knows," insurance is often genuinely the most practical route available.

Alternatives to Taking Out an Indemnity Policy

Insurance is not the only tool available when a solicitor flags a title or compliance gap. Depending on timing, urgency, and how the developer responds, several alternatives may be on the table, each with different trade-offs for you as the buyer.

AlternativeHow it worksMain drawback
Delay completionPush your completion date back until the certificate or discharge confirmation is actually issuedRisk to your mortgage offer validity, chain, removals bookings, and any rate lock on your mortgage
Retention from completion moniesA sum is held back by the solicitors until the developer produces the missing document, then releasedDevelopers on new builds are often unwilling to agree to this; less common than on resale purchases
Developer's solicitor undertakingA formal, legally binding promise from the developer's solicitor to obtain and forward the missing document within an agreed timeframeOnly as good as the undertaking's enforceability and the developer's solvency if things go wrong
Direct application to the authorityYour solicitor or the developer applies directly for a regularisation certificate or confirmation of complianceCan take weeks or months, and in some cases requires further remedial work to be identified first
Proceed on indemnity insurancePay (or have paid) a one-off premium and complete without waiting for the documentDoes not resolve the underlying issue, only the financial risk of it being enforced

In a chain-free new build purchase with no onward sale pressure, delaying completion by a few weeks to get the actual certificate is sometimes entirely realistic and arguably the cleaner outcome. Where you have a mortgage offer with an expiry date, a rate reservation fee at risk, or your own sale depending on this completion, the practical calculus shifts firmly toward accepting a well-evidenced indemnity policy rather than losing your mortgage product or rate.

If your mortgage offer has a fixed expiry, check that date against the likely timeline for resolving the issue the "proper" way before ruling out indemnity insurance as impractical — losing a competitive rate can cost far more than any premium.

A solicitor's undertaking is worth understanding specifically: it is a formal professional promise, enforceable through the Solicitors Regulation Authority, that the developer's solicitor will do something specific (obtain and forward a certificate, for example) by an agreed date. It is often used alongside, rather than instead of, an indemnity policy — the undertaking chases the paperwork while the policy covers you in the meantime.

How the Policy Is Actually Put in Place

If you and your solicitor decide an indemnity policy is the right way forward, the practical process is usually quick and happens largely without you needing to do anything beyond giving instructions.

  1. Your solicitor identifies the specific risk during their review of the title, searches, and replies to pre-completion enquiries raised with the developer's solicitor.
  2. A quote is obtained from a legal indemnity insurer (the market is served by a small number of specialist providers that solicitors have existing relationships with) based on your purchase price and the precise wording of the risk.
  3. The policy wording is checked against the actual defect — this is a step worth asking about directly, since a mismatched or overly narrow policy wording is one of the few ways this process can go wrong.
  4. Premium is paid, usually by the developer or, where agreed, deducted from or added to your completion statement.
  5. The policy is issued before completion, with the original or a certified copy held on your conveyancing file, and you should receive a copy for your own records.
  6. No notice is given to the party who could enforce the risk — this is deliberate and standard, not something to be concerned about, since most legal indemnity policies specifically require that the insured risk has not been disclosed to anyone who might act on it.

Crucially, you should keep a copy of the policy document somewhere safe with your other property paperwork — title deeds, warranty documents, planning approvals — because you will need to hand it on to your solicitor when you eventually sell. Most legal indemnity policies are designed to benefit "successors in title," meaning the protection passes automatically to a future buyer, but their solicitor will want to see the actual policy document and confirm it is still valid and adequately covers the then-current value of the property.

Store your indemnity policy document with your title deeds and new homes warranty paperwork. A missing policy document on a future sale can cause exactly the same kind of delay the original policy was meant to avoid.

It is also sensible to ask your solicitor, in plain terms, to confirm in writing what the policy covers, what it excludes, and the sum insured, rather than relying on a verbal summary at a busy point in the transaction. This written confirmation is useful both now and as a reference document in years to come.

Will Your Mortgage Lender Accept an Indemnity Policy?

Because indemnity insurance is so well established across UK conveyancing, most mainstream mortgage lenders routinely accept it as a satisfactory way of dealing with the specific categories of risk discussed in this guide — missing building regulations certificates, undischarged planning conditions, and manageable restrictive covenants. Lenders' solicitors (whether acting for the lender separately, or your own solicitor acting for both you and the lender under a joint instruction, which is the norm on most new build purchases) will check that any proposed policy meets the lender's minimum requirements, typically set out in the UK Finance Mortgage Lenders' Handbook used across the industry.

Common lender requirements include:

  • The sum insured must be adequate relative to the property's value, often required to match or exceed the purchase price, and sometimes index-linked for future appreciation.
  • The insurer must meet minimum financial strength criteria (most mainstream legal indemnity insurers used by conveyancing solicitors already satisfy this as standard).
  • The policy must cover successors in title and the lender's own interest, not just you personally.
  • Some lenders will not accept indemnity insurance for certain categories of risk at all — notably, more serious or structural planning breaches, or situations suggesting a wider pattern of non-compliance across a development, which they may instead ask to be fully resolved before releasing funds.

If you are buying with a mortgage, your solicitor should flag any indemnity requirement to your lender (or your lender's solicitor) as a matter of course, rather than leaving it to surface late. In most routine cases this causes no delay at all, since lenders see these policies on new build transactions regularly. Occasionally, a lender's underwriter asks additional questions or, rarely, declines to proceed on an indemnity basis for a particular risk, which can affect your timeline more than the insurance itself.

If you are buying with support from a scheme such as Shared Ownership or First Homes, check with your solicitor whether the scheme provider or housing association has its own separate view on accepting indemnity insurance — some have stricter internal policies than mainstream mortgage lenders.

Cash buyers have more flexibility in theory, since there is no lender to satisfy, but the same underlying question remains: is the risk one you are personally comfortable accepting indemnity cover for, bearing in mind you will need to disclose and hand over the same policy to your own buyer one day.

Questions Worth Asking Before You Agree to Proceed

When a solicitor raises indemnity insurance partway through a transaction, it can feel like a small administrative detour in a process that already has enough moving parts — exchanging on a new build already involves survey timing, mortgage offer deadlines, and reservation fee conditions. It is worth taking five minutes to ask the following before you simply say yes.

  • What exactly is the defect, in plain English? Ask your solicitor to explain it without jargon — if they cannot, ask again until they can.
  • Is the underlying work or consent actually in place, just not formally documented? Request the evidence (inspection notice, discharge letter, pre-app correspondence), not just a summary.
  • Who is paying for the policy, and is that confirmed in writing?
  • What is the sum insured, and does it match the current purchase price, not an out-of-date valuation?
  • Does the policy cover successors in title, protecting me when I come to sell?
  • Is this an isolated issue on my plot, or does it affect the whole development? A development-wide issue is worth asking your solicitor to raise with other buyers' solicitors or flag to the New Homes Quality Board if you are concerned about a pattern.
  • What would resolving this properly, rather than insuring around it, actually involve and how long would it take?
  • Has my mortgage lender's solicitor confirmed they accept this approach?
A solicitor who can answer all of these clearly and quickly is usually handling a routine, low-risk situation well. A solicitor who is vague, or who seems to be relaying information second-hand from the developer's team without independently checking it, deserves a more pointed follow-up.

It is entirely reasonable to ask for an extra day or two to consider the position, even under time pressure near exchange. Developers and their solicitors deal with this situation regularly and a short, clearly justified pause to get proper answers rarely causes lasting problems — whereas rushing past a defect you do not understand, purely to hit a date, is how buyers end up genuinely caught out.

Frequently Asked Questions

Do I need indemnity insurance on every new build purchase?

No. Most new build transactions complete with no indemnity policy at all, because the certificates and consents are all in place by the time you exchange and complete. The policy only becomes relevant when your solicitor's searches or title investigation turn up a specific, identifiable gap — it is not a routine add-on applied to every purchase as a matter of course.

Can I refuse to accept an indemnity policy and insist the issue is resolved properly instead?

Yes, in principle. You are entitled to ask the developer to resolve the underlying issue — obtain the missing certificate, get the planning condition formally discharged — rather than insure around it, though this may delay your completion date. Whether that trade-off makes sense depends on your mortgage offer deadline, chain pressures, and how long the proper resolution is likely to take.

Does indemnity insurance cover snagging defects or poor workmanship?

No. Indemnity insurance covers legal and title risks only. Physical defects in the build — cracked render, sticking doors, plumbing faults — are matters for your developer's contractual obligations and your new homes warranty (NHBC, LABC, Premier or equivalent), not an indemnity policy.

Who keeps the policy document, and what happens when I sell?

Your conveyancing solicitor should give you a copy, which you should file with your title deeds and warranty paperwork. When you sell, your solicitor will typically disclose the existence of the policy and provide a copy to the buyer's solicitor, as most policies are designed to benefit successors in title automatically.

Is a missing building regulations certificate a sign the house is unsafe?

Not necessarily. In most cases it reflects an administrative lag between a genuinely completed, inspected build and the issuing of the formal paperwork. It becomes a more serious concern only if your solicitor cannot obtain evidence that the relevant stage inspections actually took place at all.

How much does a typical policy cost, and is that cost refundable if I don't complete?

Premiums for straightforward new build risks are often in the low hundreds of pounds, as of 2026, though you should always get an exact quote rather than relying on general figures. Policies are typically only paid for and issued once you are genuinely proceeding to completion, so the question of refunds rarely arises — but ask your solicitor to confirm the timing before any payment is made.

Does indemnity insurance affect my ability to get buildings insurance or a mortgage in future?

No. A legal indemnity policy is entirely separate from your buildings and contents insurance, and from your mortgage. It should not need to be disclosed to your buildings insurer, and a well-documented policy generally causes no issues for a future mortgage application on the property, provided the policy document is available when needed.

What if my solicitor recommends a policy but I'm still not comfortable?

Push for more detail, ask the questions set out earlier in this guide, and consider getting a second opinion from an independent solicitor if the stakes feel significant. You are not obliged to proceed on any particular timetable if you have genuine, unanswered concerns about what the policy does and does not cover.

Next Steps

Indemnity insurance is a routine, generally sensible part of UK conveyancing when it is used for genuine administrative or documentary gaps on an otherwise sound new build. The practical task for you as a buyer is not to avoid it on principle, but to understand exactly what risk it is covering, make sure the evidence behind it stacks up, and confirm who is paying before you agree to proceed.

  • Browse current new build developments if you are still comparing sites and want to see how different developers handle legal disclosures during the sales process.
  • Research a specific housebuilder's track record via our builders directory before you reserve, particularly if a development has had reported delays with certificates or adoptions.
  • Search live new build properties for sale, and ask about build and completion certificate status directly with the sales team before you commit to a reservation fee.
  • Use the interactive map to check a development's wider context — nearby land use and historic boundaries can sometimes hint at where old covenants might originate.
  • Explore our buyer tools for budgeting and planning around completion dates, mortgage offer deadlines, and moving costs.
  • Use compare to weigh up shortlisted developments side by side, including factors like build stage and phase completion timing that influence how likely this kind of issue is to arise.

For related legal reading as you move through reservation, exchange and completion, see our guides on the refundability of new build reservation fees, your rights if completion is delayed, and how estate road and sewer adoption works, all of which touch on similar documentary and timing issues you may encounter alongside an indemnity policy conversation.

The best protection against being caught out by indemnity insurance is not avoiding it altogether — it is asking clear questions early, getting answers in writing, and treating your solicitor as a source of plain explanation rather than just a signature on a form.

Property Assistant

Ask me anything